Structural Stability Works

Tg Jara Resort

 

Proposed Structural Stability & Rectification Works at Tanjong Jara Resort Terengganu

Year: Awarded Sept 2014
Project Value: RM 150,000.00 

 
  • Back Filling Rock
    Back Filling Rock
  • Lean Concrete Bed
    Lean Concrete Bed
  • Preparation Of Formwork & Fixing BRC
    Preparation Of Formwork & Fixing BRC
  • Excavation Work
    Excavation Work
  • Completion Gabion Work
    Completion Gabion Work
  • Installation Geo-Textile
    Installation Geo-Textile
  • Back Filling Sand
    Back Filling Sand