Pile Jacketing & Jetty Refurbishment Works

Berth 6 & 7 Kemaman Supply Base

 

Project Title  :  The proposed remedial works for Berth 6 & 7 at Kemaman Supply Base Terengganu Darul Iman

Client  :  Pangkalan Bekalan Kemaman Sdn Bhd

Main Contractor  :  Mesra Galian Sdn Bhd

Date Commence  :  27 Febuary 2018 - 07 December 2018

 
  • Apply protective coating to rebar selected by SHO
    Apply protective coating to rebar selected by SHO
  • Clean area of hack with pressure cleaner.
    Clean area of hack with pressure cleaner.
  • hacking to top deck slab GL 7-8 at berth
    hacking to top deck slab GL 7-8 at berth
  • House keeping during and after works.
    House keeping during and after works.
  • Preparation works on formwork on top and fixing at pilecap
    Preparation works on formwork on top and fixing at...
  • Clean area to be grouted (pilecap GL8). Apply bonding agent to pilecap. Use SikaMicrocrete 2000 to grouted Pilecap area
    Clean area to be grouted (pilecap GL8). Apply bond...
  • Apply bonding agent Sika Latex. Use SikaMicrocrete 2000 to grouted area. Curing after grout slab area.
    Apply bonding agent Sika Latex. Use SikaMicrocrete...
  • Formwork preparation by carpenter.
    Formwork preparation by carpenter.
  • Apply Sika Latex as bonding agent.
    Apply Sika Latex as bonding agent.
  • Grouted area top deck using SikaMicrocrete 2000
    Grouted area top deck using SikaMicrocrete 2000