Pile Jacketing & Jetty Refurbishment Works

Shell Timur Labuan 2016

 

Project Name  :  Structure Repair and Maintenance Works to Jetty at Labuan

Client  :  Shell Timur Sdn Bhd

Date Commence  :  18 July 2016 - 28 Feburary 2017

Contract Amount  :  2,868,154.00

 
  • SHELL briefing on finding and recommendation
    SHELL briefing on finding and recommendation
  • Fall to sea drill done at site
    Fall to sea drill done at site
  • Standby boat with engine 30hp available during work at jetty
    Standby boat with engine 30hp available during wor...
  • Expose pile at pile repair area using hacking breaker
    Expose pile at pile repair area using hacking brea...
  • Preparation works for installation working platform
    Preparation works for installation working platfor...
  • Hacking to beam at shore beam repair
    Hacking to beam at shore beam repair
  • Installation of line yard for pontoon transporter
    Installation of line yard for pontoon transporter
  • Hacking to beam
    Hacking to beam
  • Drill for starter bars
    Drill for starter bars
  • Install starter bars using Hilti RE 500
    Install starter bars using Hilti RE 500
  • Rebar preparation works
    Rebar preparation works
  • Preparation for installation formworks
    Preparation for installation formworks
  • Formwork preparation before gouting works
    Formwork preparation before gouting works
  • Grouting works on beam
    Grouting works on beam
  • Dismantle formworks and apply curing compound
    Dismantle formworks and apply curing compound
  • Preparation for blasting to steel rebar
    Preparation for blasting to steel rebar
  • Hacking to beam
    Hacking to beam
  • Apply epoxy after fixing conductor for CP works
    Apply epoxy after fixing conductor for CP works
  • Blast and applied protective coating on bollard
    Blast and applied protective coating on bollard
  • Blast work for fender panel
    Blast work for fender panel
  • Blasting works on fender
    Blasting works on fender
  • Condition of fender after removal of UHMW-PE pad
    Condition of fender after removal of UHMW-PE pad
  • Condition of UHMW-PE pad after removal
    Condition of UHMW-PE pad after removal
  • Condition of pile cap after hacking
    Condition of pile cap after hacking
  • Finish pile jacketing for Mooring Dolphin 2
    Finish pile jacketing for Mooring Dolphin 2
  • Green tag added for temporary walking platform
    Green tag added for temporary walking platform
  • Installation of HDPE pipe on Mooring Dolphin 3
    Installation of HDPE pipe on Mooring Dolphin 3
  • Installation of steel rebar for beam
    Installation of steel rebar for beam
  • Installation of steel rebar for pile jacket
    Installation of steel rebar for pile jacket
  • Installation of steel rebar slab
    Installation of steel rebar slab
  • Preparations for pile jacketing on
    Preparations for pile jacketing on
  • Reinstatement of UHMW-PE pad
    Reinstatement of UHMW-PE pad
  • Removal of UHMW-PE pad for fender
    Removal of UHMW-PE pad for fender
  • ManHours LTI
    ManHours LTI